How To Create Estimates

Estimates are where your measurements and product packages turn into a sale price for your service. Exterio lets you generate several estimates at once — good, better, best — so you can put a real set of options in front of a homeowner instead of a single number.

 



When would I use this?

  • Finalizing a measurement and pricing the job
  • Building a good/better/best offering for a proposal
  • Adding an upgrade option to an existing proposal
  • Giving a homeowner a fast ballpark price without building a full estimate

 

Where do I create an estimate?

Three paths, all leading to the same Create Estimates modal.

  1. From a measurement you just finished Click Create Estimate in the bottom right after confirming your measurement. The measurements you came from are pre-selected as the source.
  2. From the Actions button Open the project, click Actions in the top right, and select Create Estimate. This is the fastest path when you’re returning to a project hours or days after building the measurement.
  3. From the Estimates tab Open the project’s Estimates tab and click Create New Estimate — from the middle of the tab or the button in the top right.


What’s in the Create Estimates modal?

  1. Measurements (Optional) — pre-selected if you came from building them. Coming from anywhere else, select the measurements you want to use, if any.
  2. Product packages (Optional) — your account’s configured packages, which drive automated cost and price calculations for the services you commonly sell. Select one, or select several to build a good/better/best offering
  3. Estimate Name — Required if not built from a package, pre-filled for you if you do select based on package
  4. Work Type — Required if not built from a package, pre-filled for you if you do select based on package
  5. Estimate Type (Primary Offering or Upgrade) — Required if not built from a package, pre-filled for you if you do select based on package

 


What’s the difference between a primary offering and an upgrade?

Each package you select gets a designation:

Designation What it means
Primary offering The main service you’re proposing
Upgrade Shown to the customer as an upgrade option

Both can be changed later, but setting them correctly here makes the proposal come together cleanly. On the proposal they will be displayed on different pages and sections.

 


What are the two pricing methods?

Packages price one of two ways, and the method is set on the package settings itself.

Method How the sales price is built
Cost plus margin Your costs are summed automatically, then your margin is applied to reach the sales price
Per unit A set rate is multiplied by a measurement — $500 per square, for example

Packages priced per unit carry a “per unit” designation next to the package name in the Create Estimates modal. That’s how you tell them apart before generating.

The estimating experience differs between the two. Both are covered below.

 


How do I generate the estimates?

Once your packages are selected and designated, click Generate Estimates.

You land in the estimate editing experience, where you can adjust costs, margins, and price points for each one. All the estimates you created appear across the top row, with the detail for the selected estimate below.

 

What does a cost plus margin estimate look like?

The top section shows your costs on the left plus your margin, building to the sales price.

Changing a cost changes the sales price. Add material, adjust labor, or change a quantity, and the price recalculates.

 

What does a per-unit estimate look like?

The video above covers cost plus margin estimates. Per-unit estimating is shown in the video below.

 

The top section is simplified and focused purely on pricing:

Element What it shows
Base price Your package rate multiplied by the measurement — for example, $500 per pitch square
Estimate line items Additional charges such as steep pitch, extra story, or per-chimney fees
Subtotal Base price plus line items
Fees Expected fees applied to gross up the final sales price

Line items with nothing to count show a quantity of zero rather than disappearing — a steep pitch charge on a roof with no steep slopes, for example. You can override any quantity, and you can add more line items from your catalog.

See Setup: Estimate Line Items for how the catalog is built.

 

Do costs still matter on a per-unit estimate?

Yes, but they don’t affect the price.

Materials, labor, and standalone expenses are still fully calculable below the pricing section. Change a quantity to 55 bundles of shingles and your cost updates — the sales price doesn’t move.

This is the point of per-unit pricing: the rate produces the price, and costing happens independently for ordering and job costing.

You can do the costing whenever it suits you — while building the estimate, or after the job is sold. See How to Reopen Costing on a Sold Estimate.

 

Can the customer see the per-unit breakdown?

Yes. Base price and line items can be passed through to the proposal’s What’s Included section, showing the homeowner how you arrived at the price — quantity, unit price, and total for each line.

What appears is controlled in your proposal package settings. See How to Edit and Customize a Proposal for a Project.

 

How do I add another estimate later?

Click New Estimate from the editing experience. The same Create Estimates modal opens, and the new estimate joins the others in your proposal.

 

How do I create an estimate without a package?

Use this when you want to quote a price quickly, or build an estimate from scratch.

  1. Open the Create Estimates modal.
  2. Leave product packages and measurements unselected.
  3. Enter a name — required. Something specific like “Main House Roof Quote.”
  4. Select the work type.
  5. Choose primary offering or upgrade (primary offering is the default).
  6. Click Create Estimate.

You’ll land in a blank estimate — no materials, no labor, no standalone expenses. Any automated fees on your account are applied but carry no dollar value until there’s something to calculate against.

From there you can:

  • Type in a price to give the customer a fast quote
  • Add items from your catalog one by one
  • Add custom items and build the estimate from scratch

 

Tips and gotchas

  • Create estimates straight from the measurement when you can. The measurement is pre-selected, which removes the step most likely to go wrong — attaching an estimate to the wrong measurement or none at all.
  • Generate your good/better/best in one pass. Selecting several packages at once is what this feature is built for. Homeowners presented with three options buy at higher rates than homeowners presented with one, and building them separately takes three times as long.
  • Check the per-unit designation before generating. The two methods behave differently once you’re in the estimate. Knowing which one you’re building saves a rep hunting for a margin field that isn’t there.
  • Per unit is for bidding at a rate — and you can still cost the job. Quoting $500 a square doesn’t mean skipping materials. Costing is just separated from pricing, so a cost correction never moves a number the customer has already seen.
  • Set primary and upgrade designations now, not later. They’re editable, but getting them right up front is what makes the proposal assemble cleanly instead of needing rework.
  • Name blank estimates specifically. “Estimate 2” tells nobody anything three weeks later. “Main House Roof Quote” or “Detached Garage — Gutters” does.
  • A typed-in price is fast, not free. Entering a number without underlying costs means no margin visibility — your estimate metrics have nothing to calculate from. Fine for a driveway ballpark; risky for anything you’d actually sign.
  • Packages are what make this fast. If estimating feels slow, the problem is usually an incomplete product package setup, not the estimating flow. Time spent configuring packages pays back on every job.