Skip to content
  • There are no suggestions because the search field is empty.

Setup: Estimate Line Items

Estimate line items are a catalog of additional charges that can be added to per-unit estimates — steep pitch charges, extra story fees, per-chimney rates. Charges tied to a measurement calculate automatically; everything else is a flat rate the rep sets a quantity for.


Before you start

Requires Feature Settings access — Manager, Admin, or Owner roles, or a custom role granted that access.

Estimate line items apply to per-unit packages only. They aren’t available on cost plus margin estimates, where additional charges are handled through catalog items and custom items on the estimate itself.


When would I use estimate line items?

  • A steep pitch charge of $100 per steep square
  • An extra story fee
  • A per-chimney rate
  • Any charge that comes up often enough that reps shouldn’t be typing it each time


Where do I create them?

Go to Settings → Products → Estimate Line Items.

From there you can manage existing line items or create a new one.


What do I set on a line item?

Field What it does
Name What it’s called on the estimate
Amount The rate or flat charge
Measurement tie Optionally tie it to an input or calculation from a measurement template

Tying a line item to a measurement works the same way products do today.


How does a line item know its quantity?

It depends on whether it’s tied to a measurement:

Line item Quantity on the estimate
Tied to a measurement that’s on the template Calculates automatically from that measurement
Everything else Comes in as a flat rate at quantity 1

Reps can override either on the estimate — changing a calculated quantity, or setting the number of chimneys on a flat-rate line.

An auto-calculated line item with nothing to count — a steep pitch charge on a roof with no steep slopes — appears at quantity zero rather than disappearing.


What can a line item be tied to?

Any input or calculation on a measurement template. Common ones:

  • Hip and ridge length
  • Ice and water length
  • Steep pitch squares
  • Any custom input your templates capture

 

Tips and gotchas

  • Tie line items to measurements wherever you can. A charge that calculates itself is a charge that never gets forgotten. A flat rate someone has to remember to adjust is the one that gets missed on the week you’re busiest.

  • A measurement tie only works if the measurement is on the template. Pointing a line item at a calculation your templates don’t capture leaves it as a flat rate at quantity 1. Check that the measurement actually exists where you need it.

  • Build the catalog from what you actually charge for. Go through your last twenty jobs and find what reps added by hand or wrote into a note. Those are your line items.

  • Zero quantities are a feature. A steep pitch charge showing zero tells the rep the system checked and there were no steep squares. A hidden line item tells them nothing, and they’ll wonder whether it was considered.

  • Name them the way a customer would understand. These can be shown to the homeowner in the proposal breakdown. “Steep Pitch — Additional Labor” reads better than “SP Fee 2.”

  • Review quantities before sending. Auto-calculated line items are only as good as the measurement behind them. If the measurement was wrong, the line item is wrong in the same direction.